
ANSI Carbon Steel Tees Sch40 Seamless Pipe Tee Butt Welding
Contact Person : John Lee
Phone Number : +86-13663270486
WhatsApp : +8613663270486
Minimum Order Quantity : | 1 | Price : | 0.15 |
---|---|---|---|
Packaging Details : | Wooden box Wooden pallet | Delivery Time : | 10 |
Payment Terms : | L/C, D/P, T/T | Supply Ability : | 99999 |
Place of Origin: | CHINA | Brand Name: | Yi Sheng |
---|---|---|---|
Certification: | ISO 9001 BV | Model Number: | 1/2"-72" |
Detail Information |
|||
Standard: | Astm | Package: | Wooded Box Wooden Pallet |
---|---|---|---|
Color: | Black | Material: | Carbon Steel |
High Light: | Buttweld Reducing Tee,Sch40 Stainless Steel Forged Pipe Fittings,ASTM Stainless Steel Forged Pipe Fittings |
Product Description
Carbon Steel Tee Astm Sch40 Butt Welded Reduceing Tee Forget Tee
Stainless steel tee for pipe fittings, pipe fittings. Use a branch in the main pipe. The three parts of stainless steel have equal diameters and different diameters; all of them are the same size. The director of the three-way of the different diameter has the same size, and the charge size of the branch pipe is smaller than that of the supervisor.
Product Description:
ype | Carbon Steel Tee Astm Sch40 Butt Welded Reduceing Tee Forget Tee |
Size | Seamless Tee:1/2"~24" DN15~DN600 Welded Tee: 1/2"~72" DN15~DN1800 |
Wall thickness | sch10, sch20, sch30, std, sch40, sch60, xs, sch80, sch100, sch120, sch140, sch160, xxs, std,sch5s, sch20s, sch40s, sch80s |
Standards | ANSI B16.9, ASME,DIN2506, JIS, BS,GOST |
Material | Carbon steel: ASTM/ASME A234 WPB,WPC, ST37-2,ST54 Alloy steel: ASTM/ASME A234 WP9-WP12-WP11-WP22-WP5-WP91 Stainless steel: ASTM/ASME A403 WP 304-304L, WP 316-316L,WP 321,201 |
Surface treatment | Transparent oil, rust-proof black oil or hot galvanized |
Packing | wooden case, pallet or as customers' requirement |
Applications | Petroleum, chemical, power, gas, metallurgy, shipbuilding, construction, etc |
Min order | 10 piece |
Delivery time | 7 after receipt of advanced payment |
Certification | ASME, ISO9001:2000 |
Delivery Term | FOB(30% down payment in advance, the balance before shipment) CIF or C&F(30% in advance , the balance against with the copy of B/L) |
Procucts Show:
Enter Your Message