
Welded Alloy Steel Pipe Fittings Sch40 P22 P11 ASTM Seamless
Contact Person : John Lee
Phone Number : +86-13663270486
WhatsApp : +8613663270486
Minimum Order Quantity : | 1 | Price : | 0.15 |
---|---|---|---|
Packaging Details : | wooden box/wooden pallets | Delivery Time : | 10 |
Payment Terms : | T/T, D/P, L/C | Supply Ability : | 9999 |
Place of Origin: | CHINA | Brand Name: | Yi Sheng |
---|---|---|---|
Certification: | ISO 9001 BV | Model Number: | 1/2"-72" |
Detail Information |
|||
Name: | Elbow | Standard: | ASTM A234. ASTM A420, ASTM A860 |
---|---|---|---|
Surface: | Alloy | Packing: | Wooden Box|/Nylon Bac/Bags |
Payment Terms: | T/T, L/C At Sight | Size: | 1/8"-2", 1/2"-48", 1/2"-6", DN15-DN1200 1/2’’~48’’(Seamless);16’’~72’’(Welded) |
Technics: | Forged,Casting,Welding | Application: | Gas And Oil Pipes, Petroleum Gas, Joining Pipe Lines |
High Light: | Din Alloy Steel Elbow,A335 Alloy Steel Elbow,6 Sch 40 90 Degree Elbow |
Product Description
Asme B16.9 Din Alloy Steel Elbow 90 10" A335 P11 P22 Wb36 P91 P92 Sch80 Alloy Steel Fittings
In the pipeline system, elbow is a pipe fitting that changes the direction of the pipeline. According to the angle, there are three most commonly used elbows: 45 ° and 90 ° 180 °, and other abnormal angle elbows such as 60 ° are also included according to the needs of the project. Elbow materials include cast iron, stainless steel, alloy steel, malleable cast iron, carbon steel, non-ferrous metals and plastics.
The connection methods with pipes include: direct welding (the most commonly used method) flange connection, hot-melt connection, electric fusion connection, threaded connection and socket connection. According to the production process, it can be divided into: welding elbow, stamping elbow, push elbow, casting elbow, butt welding elbow, etc. Other names: 90 degree elbow, right angle bend, etc.
Products Description:
Products | Alloy Steel Pipe Fittings 45Elbow A234 Grade WP91 12" X0.875" Butt Welding Elbow | |
Item | Elbow L/R S/R,Equal Tee,Reducing Tee,Concentric Reducer,Eccentric Reducer,Cap, Bend | |
Standard | ASME | ANSI B16.9,ANSI B16.28,MSS-SP-75 |
DIN | DIN2605,DIN2615, DIN2616, DIN2617, DIN28011 | |
SGP | JISB2313 | |
EN | EN10253-1 EN10253-2 | |
Material | ASME | A234 WPB,A234 WP1,A234 WP5,A234,WP9, |
A234 WPB11,A234 WPB12,A234 WPB22,WP91, | ||
A420,WPHY42,WPHY52,WPHY60,WPHY65, | ||
WPHY70,WP304,WP304L,WP304H,WP316, | ||
WP316L,WP321,WP347,WP347H | ||
DIN | ST37.0,ST35.8,ST45.8,S235JR,P235GH,P265GH, | |
10CrMo910,15CrMo,12Cr1MoV | ||
JIS | JIS G3454,STPG370,TPG410 | |
Surface | Black paint/bright paint/Galvanized | |
Marking | As customer’s requirements | |
Package | By strong plywood cases | |
Delivery | Within 30 days | |
Certificate | PED, ISO9001:2008 |
Products Pictures:
Packaging&Transportation :
Company Profile :
HEBEI YISHENG PIPING CO., LTD. was founded in 1998 and located in the hometown of martial art ----Cangzhou city,China. Our factory is set up in Zhangguandian Industrial Area,Mengcun County. The traffic is very convinient around our factory.
Our company mainly produce piping equipments including stainless, carbon and alloy steel pipe fittings which are used in oil project ,chemical industry and so on. We have many lines for producing elbows, Tees, educers,caps and flanges. With the most efficient machines and the advanced testing machines, we can produce varies kinds of pipe fittings for you.With it's standards covers from Japanese, American and Germany standard . In order to establish good reputation around the world's market, we will strengthen our management and improve our service continuously.
We welcome you to visit our factory in the near future and hope we can start a good relationship very soon.
FAQ
1. Are you trading company or manufacturer?
We are manufacturer .
2. How long is your delivery time?
Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
3. Do you provide samples? Is it free or extra?
Yes, we could offer the sample for free charge but need pay the cost of freight.
4. What is your terms of payment?
Payment<=1000usd, in="" advance.="" payment="">=1000USD, 30% T/T in advance ,balance before shippment.
Enter Your Message