
WPL6 Carbon Steel Pipe Fittings Butt Weld 90 Degree LR Elbow Seamless Sch80
Contact Person : John Lee
Phone Number : +86-13663270486
WhatsApp : +8613663270486
Minimum Order Quantity : | 1 | Price : | 0.15 |
---|---|---|---|
Packaging Details : | wooden box/wooden pallets | Delivery Time : | 10 |
Payment Terms : | T/T, D/P, L/C | Supply Ability : | 9999 |
Place of Origin: | CHINA | Brand Name: | Yi Sheng |
---|---|---|---|
Certification: | ISO 9001 BV | Model Number: | 1/2"-72" |
Detail Information |
|||
Material: | Carbon Steel,Stainless/alloy Steel | Name: | Elbow |
---|---|---|---|
Technics: | Hot Pushing | Packing: | Pallet,packed By Wooden Case |
Connection: | Welding,Carbon Steel And Stainless Steel Heat Forged | Wall Thickness: | STD, XS, XXS, SCH20,SCH30,SCH40, SCH60, SCH80, SCH160,XXS |
Elbow: | 30° 45° 60° 90° 180°,etc | Transport Package: | In Bundle/Seaworthy Woodencase |
Origin: | China | Specification: | A234 A403 A860 A420 A105 |
Certification: | ASME, ANSI, JIS, API | Shape: | Equal |
High Light: | dn15 carbon steel elbow,hot pushing carbon steel elbow,lr sch40 cs pipe elbow |
Product Description
DN15 - DN600 Carbon Steel Pipe Fittings LR 90 Degree Elbow Seamless Sch 40
In piping, a bend is a piece of pipe that changes the direction of the pipe. According to the Angle, there are 45° and 90°180° three most commonly used, in addition, according to the needs of the project also includes 60° and other abnormal Angle elbow. Elbow materials are cast iron, stainless steel, alloy steel, malleable cast iron, carbon steel, non-ferrous metals.
Products Description:
BENDS SPECIFICATION REQUIREMENTS | |
GENERAL DESCRIPTION | |
Outside Diameter | 1/2" to 100" |
Thickness | SCH20, SCH30, SCH40, STD, SCH80, SCH100. SCH120, SCH160. XXS |
Design Life | 30 Years |
Pipeline Design Code | ASME B16.49/ MSS-SP75 |
Service Fluid | Full Well Stream, Offshore Shallow Water Application, Subject to Potential Late Souring and Eventual Bacteria induced Corrosion. |
Third Party Inspection | Required (Upon agreement with COMPANY. Mechanical tests to be witnessed) |
MOTHER PIPE REQUIREMENTS | |
Material | Carbon Steel |
Grade | API 5L - Gr.B/X42/X46/X52/X60/X70 etc.(PSL1 & PSL2) ISO 3183- L245/L290/L320/L360/L415/L485(PSL1) ISO 3183- L245N/L245R/L290Q/L360Q/L415Q/L485Q(PSL2) (Seamless) |
Specification | API 5L: ISO 3183: 2007 |
Chemical Composition | API 5L: ISO 3183: 2007, Sour Tests Cab Be Chosed. |
Charpy Impact Test | Required, per API 5L: ISO 3183: 2007, ASTM A370 |
Hardness Test | Required, per API 5L |
Hydro-test | Required, per API 5L |
Packing: | Standard Export Packaging or As Per Customer's Requirement. |
BEND REQUIREMENTS | |
Specification | API 5L: ISO 3183: 2007 |
Charpy Impact Test | Required, per API 5L: ISO 3183: 2007 MSS SP75 |
Hardness Test | Required, per API 5L: ISO 3183: 2007 MSS SP75 |
Dimensional Tolerance | +/-1 degree |
External Surface Treatment | 3-Layers Polyethylene / Fusion Bonded Epoxy (FBE) |
Number of Qualification Bends | Per section API 5L: ISO 3183 |
Marking | Per API 5L: ISO 3183 |
Packaging&Transportation :
Company Profile :
HEBEI YISHENG PIPING CO., LTD. was founded in 1998 and located in the hometown of martial art ----Cangzhou city,China. Our factory is set up in Zhangguandian Industrial Area,Mengcun County. The traffic is very convinient around our factory.
Our company mainly produce piping equipments including stainless, carbon and alloy steel pipe fittings which are used in oil project ,chemical industry and so on. We have many lines for producing elbows, Tees, educers,caps and flanges. With the most efficient machines and the advanced testing machines, we can produce varies kinds of pipe fittings for you.With it's standards covers from Japanese, American and Germany standard . In order to establish good reputation around the world's market, we will strengthen our management and improve our service continuously.
We welcome you to visit our factory in the near future and hope we can start a good relationship very soon.
FAQ
1. Are you trading company or manufacturer?
We are manufacturer .
2. How long is your delivery time?
Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
3. Do you provide samples? Is it free or extra?
Yes, we could offer the sample for free charge but need pay the cost of freight.
4. What is your terms of payment?
Payment<=1000usd, in="" advance.="" payment="">=1000USD, 30% T/T in advance ,balance before shippment.
Enter Your Message